Penmann recently finalised a complex HVAC upgrade at Danone Nutricia's Liverpool-based production site, providing a fully engineered ventilation and climate control system designed to satisfy stringent hygiene and production requirements. The contract covered the end-to-end implementation of cutting-edge HVAC systems across non-production, Medium Care (MC) and High Care (HC) areas. https://wavesocialmedia.com/story6320552/penmann-ltd-finalises-comprehensive-hvac-refurbishment-for-the-liverpool-based-nutricia-facility-in-line-with-fsi-phase-1-and-2