But what about the heat produced during clinker cooling or even the drying processes? Sector studies estimate that almost 40% of all Electricity inputs in cement production are wasted by means of heat loss, primarily as a result of out-of-date cooling methods and improperly insulated kilns. Irrespective of these troubles, https://purethermal.co.uk/media-news/november-launch-waste-heat-recycling-design-support-service-from-pure-thermal-and-oilon/