As noticed from the figure underneath, continual auger is utilized to drill the borehole, raise up drilled soil, and pour concrete although the auger is moved up. Therefore, the borehole would not have to have casing or hydrostatic tension to prevent harm to the borehole wall. Shed your password? Make https://judahskykv.popup-blog.com/31796596/a-review-of-cast-in-situ-piles