Utilities observed for the duration of potholing can be found to the surface by placing two reference points (ordinarily 36" aside) on both side of the pothole along the centerline (or edge) with the utility, working with paving nails or 60 penny nails as appropriate. Depth measurements (to the closest https://directory6.org/listing/util-locate-297258